Tess Corners Drive Reconstruction Minimize

Dear Resident/Property Owner:

At the Common Council meeting held September 27th, 2011, the City of Muskego approved a contract for design services for the reconstruction of Tess Corners Drive, from Woods Road to Janesville Road (CTH “L”). This contract, which entails all necessary survey and design work for the reconstruction of Tess Corners Drive, was awarded to Foth Infrastructure & Environment, LLC.

The design of Tess Corners Drive will include a typical rural roadway cross section (ditches along the roadway’s shoulders) with two twelve foot lanes and one foot wide paved shoulders. The addition of an eight foot wide paved recrerational trail on the west side of the roadway is also included with this project. Construction is currently anticipated to begin in June of 2012, however, utiility relocation work may begin prior to this time. 

Please download current plans below to view the most up to date design information.

At this point, I would like to assure you that we will make every effort to ensure this process will be completed as efficiently and thoughtfully as possible.  Please do not hesitate to contact me directly with any questions or concenrs you may have.   


Thank you,

City of Muskego
David Simpson, P.E.
City Engineer 
dsimpson@ci.muskego.wi.us
262-679-5686


90% Preliminary Design Plans
Pages 1-18
Pages 19-60
Pages 61-79